Skip to content
Carpenter Austin Texas(737) 415-9388
Cabinet Installation, Austin, Texas: kitchen under construction with new cabinets, tools and an air compressor on a covered floor

Interior carpentry · Austin, TX

Cabinet installation for store-bought & custom cabinets in Austin, TX

The cabinets are bought. Maybe they're stacked in boxes in the garage, or the delivery is booked for next week. Now they need to go on the wall level, square and solid, in a house where no wall is quite straight.

Read more

Carpenter Austin Texas installs cabinets from big-box stores, IKEA, online ready-to-assemble brands and custom shops. We set every box level and square, fasten it into the studs, scribe it to the real walls and leave it ready for countertops. Because we're carpenters, the finish work is part of the job too: fillers, end panels, crown and trim.

If you've been searching for cabinet installation Austin homeowners can book without buying the cabinets from the installer, or a cabinet installer Austin kitchens can count on for the details, this page explains what we do and what it costs. Haven't bought cabinets yet? We build them too, through our Austin cabinet makers. Every quote is free and written, and we work in all 13 areas of Austin.

Send your cabinet order list or layout drawing and we'll give you a clear written price for installation. We show up on time, protect your floors and clean up every day.

The numbers behind this work

01Who it's for

Who our cabinet installation service is for

In short

If your cabinets are bought, or soon will be, and you want them hung level, fastened right and trimmed to look built in, this service is for you.

  1. 01
    Homeowners who bought cabinets from a big-box store and want an independent installer
  2. 02
    IKEA kitchen owners who need the flat-pack assembled and installed
  3. 03
    Buyers of online ready-to-assemble cabinets
  4. 04
    Owners of custom or semi-custom cabinets from a shop that doesn't install
  5. 05
    Investors and flippers updating rental kitchens
  6. 06
    Homeowners replacing a few cabinets or adding a new run
  • Why does a carpenter matter here?

    Walls in real houses bow, floors slope and corners aren't square. The finish details, the scribes and fillers and crown, are what make store-bought cabinets look custom.

Before you book an installer

Have your order list or layout drawing ready, with the cabinet codes, widths and the fillers and panels you ordered. An installer prices the job from that list, so a complete one gives you a quote that matches the real work.

Know where the cabinets are coming from and when. The delivery date, whether the boxes arrive assembled or flat, and where they will be stored before install all shape the schedule and the work on the first day.

If you are replacing only a few cabinets, have a door or a photo of the existing ones on hand, so the new boxes can be lined up with the old run.

Wood should be cut, fitted, and finished like it’s meant to last a lifetime.

The owner, Carpenter Austin Texas

02What we do

Cabinets we install

In short

Every cabinet type has its own quirks during install. Below are the types we install, what's specific to each, and one tip for each.

  1. Kitchen cabinet installation Austin homeowners book with us covers full kitchens and partial runs. That includes uppers and bases, tall pantry and oven cabinets, and islands built from base cabinets and anchored to the floor so they can't shift.

    Appliance openings get set to the appliance maker's specs, not to the cabinet catalog. We cut sink bases for the plumbing and fit panel-ready dishwasher and fridge panels, then close the gaps with fillers and end panels. Crown and light rail finish the uppers.

    Countertops come last. We leave the base cabinets level and fastened so the fabricator can template them right away.

    Tip: have your appliance spec sheets on hand before install day, since a fridge opening that's half an inch short is a problem nobody wants to find on delivery.

    Decide where the microwave and range hood go before install day. Their mounting heights and clearances come from the appliance instructions, and they set where the upper cabinets above them must sit.

    Ask about this

  2. IKEA's SEKTION kitchens go together differently from American stock cabinets. The uppers hang on a steel suspension rail that's screwed into the studs, and the bases stand on adjustable legs with a toe-kick plinth clipped to the front.

    The flat-pack takes real time to assemble: boxes, drawers, fronts and hinges all arrive in parts. Then come the cover panels, deco strips and fillers that make the kitchen look finished, and the alignment of every door and drawer front.

    Third-party custom doors made for IKEA boxes are another option. Those doors are made for the IKEA hinges and drawer hardware, so they go on the same way as IKEA's own fronts.

    For anyone looking into IKEA cabinet installation in Austin, two notes. We're independent installers with no affiliation to IKEA, and IKEA's product warranty on the cabinets is separate from our installation work.

    Keep every bag of hardware with its box until assembly. Flat-pack hinges, fittings and leg sets look alike across sizes, and a mixed-up bag can stall assembly while the right piece is found.

    Ask about this

  3. Stock cabinets from home-improvement stores and ready-to-assemble online brands come in standard widths, usually in 3-inch steps. Your walls don't.

    Ready-to-assemble boxes need to be glued and fastened square before they go up, because a box that's out of square makes its door hang crooked forever. We also check each one for shipping damage before assembly.

    Fillers and scribe strips cover the gap between standard sizes and your actual wall length.

    Tip: order a couple of extra fillers and a length of scribe molding with your cabinets. They're cheap, and running out halfway through an install stops the job.

    Open cabinet boxes from the back, not the front. Cutting through the carton on the door side is the quickest way to scratch a finished face before it ever reaches the wall.

    Ask about this

  4. Some cabinet shops build and deliver but don't install. We install their cabinets following the maker's drawings.

    Before fastening anything, we compare the drawings to the room and flag any mismatch, such as a wall that's an inch shorter than drawn. Any finish touch-ups get coordinated with the shop that built the cabinets so the color matches.

    Tip: ask the maker for the installation specs and how much scribe allowance they built into the end panels and fillers.

    Ask the shop how the finish can be touched up on site. A matching touch-up pen, a small can of the stain or paint and a few spare door bumpers make small install marks simple to fix.

    Ask about this

  5. Bathroom vanities need leveling on tile floors that are rarely flat, plus cut-outs for the supply lines and drain. A plumber connects them afterward.

    Laundry uppers go over the machines at a height you can reach. Garage cabinet systems get anchored for heavy loads, because a cabinet full of tools and paint cans carries far more weight than a kitchen upper full of glasses. Utility-room wall units go up the same way.

    Closet shelving and closet systems are a separate service. See custom closets in Austin.

    Measure the drain and supply pipe positions before choosing a vanity. A drawer bank right where the drain leaves the wall may need a U-shaped drawer or a different vanity layout.

    Ask about thisRead the custom closets page

Check your order before install day

Compare the order with the layout line by line. Each cabinet code should match a spot on the drawing, and the fillers, end panels, toe-kicks, crown and light rail should be on the order too. Trim pieces are the items most often forgotten, and they are what make the run look finished.

Check the hinge side on single-door cabinets. A door that opens toward the wall or across the fridge is a common ordering error, and many cabinet lines let the hinge side be set during assembly, so catching it early saves a return.

Wood should be cut, fitted, and finished like it’s meant to last a lifetime.

The owner, Carpenter Austin Texas

03Checklist

What a professional cabinet installation includes

In short

A careful install starts from the floor's high point and the studs, sets each box level without forcing it, and ends with trim, adjusted doors and level bases.

Day Fifty-One, Cabinet Installation Begins

Here's what happens on a careful install, in order

  • We check the delivery against your order and inspect every box for damage.
  • We find the high point of the floor and snap a level line around the room from it.
  • We locate and mark every stud along the cabinet walls.
  • We set the cabinets in a planned sequence, usually starting from a corner, so every box lines up with the one before it.
  • Each box gets shimmed and leveled, and none is forced against a wall that isn't flat.
  • We fasten through the back rail of each box into studs with cabinet screws, never drywall screws.
  • Neighboring boxes get clamped and screwed together so the face frames sit flush.
  • Fillers and end panels get scribed to the wall so they follow its waves.
  • We install the cabinet crown molding, light rail, toe-kicks and panels.
  • We adjust every door and drawer for even gaps, then install the hardware.
  • The bases are left flat and level, ready for countertop templating.
  • We clean up.

Why the order of work matters

Every later step depends on the level line. If the first base cabinet is set from a low spot, every cabinet after it inherits the error, and the countertop ends up shimmed or cracked. Finding the high point first means boxes are only ever shimmed up, never cut down.

Fastening into studs is the other foundation. A loaded upper cabinet carries plates, glasses and canned food, and drywall alone cannot hold that weight. Cabinet screws through the back rail into the framing carry it, and screwing neighbouring boxes together spreads the load along the run.

04Before we start

How to prepare for your cabinet installation

In short

Eight things you handle before install day keep the job moving and stop small problems, like a missing panel or a wrong-size opening, from stalling the work.

  1. Step 01

    Open and inspect every box when it's delivered

    Report damage to the seller quickly and keep the packaging.

    Open each box as it arrives and check the finished faces, the corners and the panels inside. Shipping damage often hides at a corner or on the side that faced the truck wall, and a crushed corner can rack the box even when the face looks fine.

    Count the parts against the packing list, including hardware bags, shelves and toe-kicks. Report damage or shortages to the seller right away, with photos, and keep the packaging, since many sellers need it for a return or exchange.

    Store the checked boxes flat and dry, off a damp slab, so they stay square until install.

    What to expect You open each box, photograph any damage, count the parts and report problems to the seller while keeping the packaging.

  2. Step 02

    Confirm the final layout drawing and have the appliance spec sheets ready

    The final layout drawing is the map the installer works from. Check that every cabinet on it matches the order and that the dimensions match the room, especially around windows, doors and corners.

    Appliance spec sheets give the exact opening sizes, the clearances and where the power and water need to be. A fridge, range or dishwasher that changes model after the cabinets are ordered can leave an opening too small or too wide, so confirm the models now.

    Keep both documents in one place, printed or on your phone, so they are on hand for the quote visit and on install day.

    What to expect You confirm the final layout, gather the appliance spec sheets and keep them ready for the quote visit and install day.

  3. Step 03

    Get the old cabinets out, or book us to remove them

    Old cabinets come out top first: doors, then uppers, then countertops and bases. The water and gas to the sink and range have to be shut off and disconnected by the right trade before any base can move.

    Once the wall is open, look at what was hidden. Water stains, a soft subfloor, mould or termite trails behind a sink base need repair before new cabinets cover them again. Old adhesive and screws come out of the wall so the new boxes sit flat.

    If you want us to remove them, say so when you ask for the quote so removal is part of the written price.

    What to expect You clear out the old cabinets, or book us to remove them, and look at the wall and floor behind them.

  4. Step 04

    If anything is moving, have licensed trades finish the plumbing, electrical and gas rough-ins first

    Any plumbing, electrical or gas line that moves has to be in its new spot before the first cabinet goes up. A sink drain that lands where a cabinet side should be, or an outlet hidden behind a pantry cabinet, means cutting the new cabinet or redoing the rough-in.

    Mark the new locations on the wall against the layout so every trade works to the same plan. Under-cabinet lighting wires, island outlets and any dishwasher or disposal circuits belong in this stage too.

    Moving these lines is not on the City of Austin's permit-exempt list, so allow for that in your plan.

    What to expect You have your plumber, electrician or gas fitter finish any line that moves, matched to the marks on the layout.

  5. Step 05

    Decide the flooring order with us and your flooring installer

    Whichever order you choose, the cabinet heights have to account for the finished floor. A dishwasher or range slides in under the countertop from the finished floor level, so if a thick tile goes down after the cabinets, the appliance opening can end up too short.

    If the flooring goes in first, it needs protecting during the install, and heavy cabinets sit on it. If it goes in after, the toe-kicks and end panels have to leave the right gap for it to slide under or butt against.

    Settle the order with both installers before either one starts work, and write it into both schedules.

    What to expect You agree the order of flooring and cabinets with us and your flooring installer before either job begins.

  6. Step 06

    Patch and prime the walls where cabinets go

    Painting behind cabinets is far easier before they're up.

    Walls behind cabinets are hard to reach once the boxes are up, so this is the time to repair holes, fill old anchor spots and flatten any patch that bulges. A high spot on the wall can push an upper cabinet out of plumb.

    Prime the patched areas at least, and paint the full walls if you are changing colour. Paint showing in the gap above a backsplash or beside an end panel is far easier to get right before the cabinets block the roller.

    Let the paint dry fully before install so the cabinet backs do not stick to it or mark it.

    What to expect You patch, prime and paint the cabinet walls so nothing is left to reach behind the boxes once they are up.

  7. Step 07

    Clear a path in, and a staging area such as the garage for the boxes

    Cabinets arrive large and heavy. Clear a path from the door to the kitchen, move rugs and fragile items out of the way, and take note of tight turns or stairs that a tall pantry cabinet must pass.

    A staging area, such as the garage or an empty room, keeps the boxes out of the work zone so the kitchen floor stays clear for assembly and layout. Keep the boxes off a damp slab and out of direct sun, and stack them so their labels show.

    Leave room to lay the largest box flat for assembly, since flat-pack panels need floor space.

    What to expect You clear a path in and set aside a dry staging area where the boxes can be stored and opened.

  8. Step 08

    Book the countertop fabricator for after the install

    Fabricators template on installed, level, fastened base cabinets, so the countertop booking follows the install. Template too early and the tops are cut to cabinets that are not there yet, or that shift after the template is taken.

    Have your sink, faucet and cooktop models chosen and on site, since the fabricator needs them for the cut-outs. Decide on overhangs, edge profile and any backsplash height while you are booking, so the template visit only measures.

    Expect a stretch without a working sink between install and countertops, and set up a temporary kitchen with a kettle, microwave and dish tub in another room.

    What to expect You book the fabricator for after the install and have the sink, faucet and cooktop on hand for the template.

05How it works

Our cabinet installation process

In short

Five steps take you from a quote based on your order list to installed, adjusted cabinets ready for countertops.

  1. Step 01

    Quote

    We price the job from your order list or drawing, then visit to check the walls and floors.

    The price starts from your order list or layout drawing: the number of boxes, the tall and heavy units, the panels, fillers and trim, and whether assembly is needed. That gives you a scope you can compare against other quotes.

    The site visit checks what the paperwork cannot show. We check how far the floor is out of level, how straight the walls are, where the studs fall and how easy the path in is. A badly sloped floor or a wavy wall adds scribing and shimming, so it belongs in the price.

    Point out anything you plan to change, such as moved plumbing, before the quote is final.

    What to expect You send the order list or drawing, then show us the room so we can check the walls, floor and path in.

  2. Step 02

    Scheduling and pre-install check

    We book your install date and check every box against the order before day one.

    The install date is set around your delivery, the trades who must finish rough-ins first and the countertop booking afterward. Getting that order right avoids arriving to a room that is not ready.

    Before day one, every box is checked against the order and the layout. Wrong sizes, missing panels, a hinge on the wrong side or a damaged face can still be sent back while there is time, rather than being discovered with half the kitchen hung.

    Missing hardware and trim pieces get flagged at this stage too, so the job is not stopped halfway for a single filler.

    What to expect You get your install date and hear about any order problems early enough to reorder before day one.

  3. Step 03

    Assembly

    Ready-to-assemble and IKEA boxes get put together and squared.

    Flat-pack and ready-to-assemble boxes are put together on a flat surface, glued where the system calls for it and checked for square by measuring the diagonals. A box that is even slightly out of square makes its doors hang crooked.

    Drawers, hinges, shelves and legs go on during assembly, and each box is labelled to its place on the layout. Damaged or missing parts found now go straight on the list for the seller, with photos.

    Pre-assembled cabinets skip most of this, but they still get a check for square and for shipping damage before they go up on the wall.

    What to expect You see the flat-pack boxes become square, labelled cabinets, with any damaged parts photographed for the seller.

  4. Step 04

    Installation and trim-out

    Floors and counters stay covered while we hang, level, fasten and trim the cabinets.

    Floors and countertops in the work area are covered first. A level line goes around the room from the floor's high point, the studs are marked, and the cabinets go up in a planned sequence so each one lines up with the one before.

    Each box is shimmed level, fastened into studs through its back rail and clamped and screwed to its neighbour so the faces sit flush. Fillers and end panels are scribed to the wall, then crown, light rail, toe-kicks and panels finish the run.

    Appliance openings are measured against the spec sheets before the trim closes them in.

    What to expect You see the cabinets go up level and fastened, the gaps scribed closed and the trim go on, with your floors covered throughout.

  5. Step 05

    Final adjustments and walkthrough

    We go through every door and drawer with you, finish any punch-list items, and clean up.

    Every door and drawer is adjusted for even gaps and smooth travel, and the hardware goes on to consistent marks. The bases are checked once more for level, since the countertop depends on them.

    During the walkthrough you open everything yourself and look for uneven gaps, rubbing doors, slides that stick or marks on the finish. Check that the dishwasher and oven doors clear the handles beside them. Anything you find goes on the punch list and gets finished before we leave.

    Clean-up covers dust, packaging, offcuts and floor protection, so the room is left ready for the countertop template.

    What to expect You test every door and drawer with us, point out anything to fix and get a clean room ready for templating.

06Pricing

Cabinet installation cost in Austin

In short

Here is what published sources say. HomeAdvisor's 2025 data puts the labor to hang cabinets at roughly $50 to $450 per linear foot nationally. TaskRabbit lists an Austin average of about $59 an hour for cabinet installation Taskers. Angi notes that labor is typically 25% to 50% of a cabinet project's total cost.

Assembly is real work before anything hangs

Flat-pack boxes arrive as panels, hinges and drawer parts, and putting a full kitchen together takes careful work before a single cabinet goes on the wall.

Uneven rooms cost more than square ones

Each scribe, shim stack and custom filler is hand work, so a wavy wall or a sloped floor adds labor that a flat, square room does not need.

A complete order keeps the price stable

Missing panels, a wrong-size filler or a damaged box can mean a return trip, so checking the order early protects both the schedule and the quote.

07Austin conditions

Installing cabinets in Austin homes: local challenges

In short

Clay soil is the first challenge. Austin sits partly on expansive clay, especially the Blackland Prairie clay in east and northeast Austin, and slab homes there can end up with floors out of level. Older pier-and-beam houses in Hyde Park, Travis Heights, Bouldin Creek and East Austin can be noticeably out of level too. We shim and scribe the cabinets to those floors instead of forcing boxes into a line they can't hold.

Cabinet doors installed

Older walls are the second

Plaster and lath, or walls with a wave in them, make studs harder to find and need scribe strips to close the gaps.

Newer builds with long, open-plan walls make straight runs easier

We still check them with a level, because new walls aren't always as straight as they look.

Then there's heat

Cabinets stored in a hot Austin garage for weeks can pick up moisture and warp if they sit on a damp slab. Keep the boxes dry and flat, and we'll bring them inside to acclimate before install.

On permits, the City of Austin's list of work exempt from building permits includes "cabinets, countertops, and similar finish work." Moving plumbing, gas or electrical lines needs licensed trades and permits. If you're changing the kitchen layout, see our renovation carpentry page.

Flat-pack panels soak up slab moisture

Boxes left on a garage slab through a humid stretch can absorb moisture along the bottom edge, so stand them on pallets or blocks and keep them covered until install.

Pier-and-beam floors move under weight

In older Austin houses, a full run of cabinets and a stone top add a lot of load to one part of the floor, so a heavy island deserves a look at the framing below before it goes in.

Long runs show every wave in a wall

Even straight-looking drywall in a newer home can bow between studs, which shows as a gap behind a long countertop. A straightedge along the wall before install shows where scribes will be needed.

08Mistakes to avoid

Common DIY cabinet installation mistakes

In short

Most DIY problems start with the floor's high point, the studs and forcing boxes into place, and they show up later as crooked doors or a cracked countertop.

The verdict

DIY is possible for a simple run of a few cabinets. For a full kitchen with a stone countertop, hire a pro, because a cracked stone slab is an expensive mistake to fix.

If you install yourself

Get a long level and a laser or a straight board before you start, and find the floor's high point across the whole run, not just in one corner. Mark the studs on the wall above and below where the cabinets go, so you can still see them once a box covers the middle.

Dry-fit the run before fastening anything. Set the bases in place, check the fillers and appliance openings and confirm the corner cabinet clears its neighbours. Fixing a layout error is easy before the screws go in and hard after.

What goes wrong

  • Not finding the floor's high point first, so the bases end up out of level
  • Fastening to drywall, or using drywall screws instead of cabinet screws
  • Forcing boxes against a bowed wall, which racks them and leaves doors crooked
  • Skipping fillers, so doors and drawers hit the wall or an appliance handle
  • Hanging uppers too low or too high for the microwave, the range hood and its clearances
  • Uneven gaps between doors
  • Leaving bases out of level under a stone top, which can crack the slab
Call a carpenter instead

09Why us

Why choose Carpenter Austin Texas as your cabinet installer

In short

We install store-bought, IKEA and custom cabinets as carpenters, check your order before day one and give you a clear written price.

  1. 01
    We're carpenters, not just assemblers, so the fillers, scribes and crown look built in
  2. 02
    We install store-bought, IKEA and custom cabinets
  3. 03
    Our pre-install check catches order mistakes before they cost you
  4. 04
    We arrive on time, protect your floors and counters, and clean up every day
  5. 05
    You get a clear written price

Questions to ask any installer

Ask how they find level and what they fasten into. An installer who mentions the floor's high point, stud locations and cabinet screws through the back rail is working the way a lasting install needs.

Ask how they deal with gaps at uneven walls. Scribing fillers and panels to the wall looks built in, while caulk or thick trim over a wide gap looks like a patch.

Ask what happens if a box arrives damaged or a part is missing, so you know how the job will run if the order has a problem.

Wood should be cut, fitted, and finished like it’s meant to last a lifetime.

The owner, Carpenter Austin Texas

10Service area

Areas we serve for cabinet installation

In short

We install cabinets in all 13 areas of Austin listed below, from a single vanity to a full kitchen.

Open in Maps

Central Austin

Central Austin older bungalows and cottages, historic districts like Hyde Park, and renovations on tight lots.

older bungalows and cottages, historic districts like Hyde Park, and renovations on tight lots.

(737) 415-9388

Central Austin, TX

Open in Maps

North Austin

North Austin mid-century ranch homes in established neighborhoods.

mid-century ranch homes in established neighborhoods.

(737) 415-9388

North Austin, TX

Open in Maps

Northeast Austin

Northeast Austin newer subdivisions sitting on the clay east of I-35.

newer subdivisions sitting on the clay east of I-35.

(737) 415-9388

Northeast Austin, TX

Open in Maps

Northwest Austin

Northwest Austin Hill Country lots on sloped limestone, with decks built for the view.

Hill Country lots on sloped limestone, with decks built for the view.

(737) 415-9388

Northwest Austin, TX

Open in Maps

Far North Austin

Far North Austin newer subdivisions where builder-grade trim and fences often need upgrades.

newer subdivisions where builder-grade trim and fences often need upgrades.

(737) 415-9388

Far North Austin, TX

Open in Maps

East Austin

East Austin older homes east of I-35 on clay soil, with plenty of infill and renovation.

older homes east of I-35 on clay soil, with plenty of infill and renovation.

(737) 415-9388

East Austin, TX

Open in Maps

West Austin

West Austin hillside homes on limestone, where decks and stairs follow the slope.

hillside homes on limestone, where decks and stairs follow the slope.

(737) 415-9388

West Austin, TX

Open in Maps

South Austin

South Austin established neighborhoods with a mix of older and newer homes.

established neighborhoods with a mix of older and newer homes.

(737) 415-9388

South Austin, TX

Open in Maps

South Central Austin

South Central Austin older houses around neighborhoods like Travis Heights, many with porches and original trim.

older houses around neighborhoods like Travis Heights, many with porches and original trim.

(737) 415-9388

South Central Austin, TX

Open in Maps

Southeast Austin

Southeast Austin growing neighborhoods on clay soils, where doors and trim feel the ground move.

growing neighborhoods on clay soils, where doors and trim feel the ground move.

(737) 415-9388

Southeast Austin, TX

Open in Maps

Southwest Austin

Southwest Austin hillside lots with decks and views toward the Hill Country.

hillside lots with decks and views toward the Hill Country.

(737) 415-9388

Southwest Austin, TX

What changes from house to house

Older central and East Austin homes bring plaster walls, out-of-level floors and narrow doorways, so scribing, shimming and the path in for tall cabinets take more planning.

Newer homes farther out bring long, open walls and big islands. The runs are straighter, but a long run magnifies any small error in level, so the level line matters as much as it does in an old house.

Condos and townhomes add stairs, elevators, shared hallways and building rules about work hours and deliveries, so check those with your building before booking an install date.

11Questions

Cabinet installation FAQs

Cost and quotes

01

How much does it cost to install kitchen cabinets in Austin?

HomeAdvisor's 2025 data puts cabinet installation labor at roughly $50 to $450 per linear foot nationally, and TaskRabbit lists an Austin average near $59 an hour. The number of boxes, assembly, an island and trim work move the price most. Send your order list for a free written quote.

02

Is cabinet assembly included in the installation price?

Your written quote spells out whether assembly is part of it. Ready-to-assemble and IKEA cabinets arrive flat, and every box, drawer and hinge has to be put together and squared before it can hang, so assembly adds real hours to the job.

03

Does removing old cabinets cost extra?

Removal is extra work, and the quote lists it if you need it. We take old cabinets out carefully. Sometimes the wall or floor behind them needs repair after years of hidden leaks or old termite damage, and we show you before fixing anything.

04

Is it cheaper to buy cabinets myself and hire an installer?

It can be, especially during a sale or with IKEA. The trade-off is that you handle the ordering, the damage claims and any missing parts. We help by checking the order against the layout well before install day, when there's still time to reorder a damaged box or a missing filler.

IKEA and store-bought cabinets

01

Do you install IKEA kitchen cabinets in Austin?

Yes. We assemble the flat-pack, hang the uppers on the suspension rail, set the bases on their legs and clip on the toe-kicks. We're independent of IKEA and have no affiliation with the company.

02

Can you install cabinets I bought from Home Depot or Lowe's?

Yes. Before install day we check the order against your layout and look for shipping damage, so any problem goes back to the store while there's still time to fix it.

03

Do you install online RTA cabinets?

Yes. With ready-to-assemble cabinets, assembly quality decides how the kitchen hangs, so we glue and square every box. Missing parts can delay the job, which is why we inventory every box before install day.

04

Can you install custom doors on IKEA boxes?

Yes, if the doors are made for the IKEA hinge and drawer system. We hang and adjust them the same way as standard IKEA fronts.

05

What if parts are missing or damaged when you arrive?

We stop, photograph the problem and help you file the claim with the seller. If the missing piece holds up the rest of the run, we reschedule that part of the job once the replacement arrives.

06

Can you modify store-bought cabinets to fit my space?

Within limits, yes. We can add fillers and scribes, cut end panels, and in some cases reduce the depth of uppers. If the room needs bigger changes than that, custom cabinets may be the better choice.

07

Can you install cabinets on a suspension rail system?

Yes. That's how IKEA uppers hang. The rail has to be dead level and screwed into studs, because every upper hangs from it.

Timeline and scheduling

01

How long does kitchen cabinet installation take?

It depends on the size of the kitchen, whether boxes need assembling, whether there's an island and how much trim goes on. Your written quote includes the schedule for your kitchen.

02

Should flooring go in before or after cabinets?

It depends on the floor. Floating floors usually go in after the cabinets, since they need room to expand and shouldn't be pinned down by cabinet weight. Tile and nail-down hardwood can run under the cabinets. Talk it through with us and your flooring installer before either job starts.

03

Should I paint before cabinets are installed?

Paint the walls behind the cabinets first, since it's far easier with nothing in the way. At the very least, prime them. Final touch-ups can wait until after the install.

04

When can my countertops be templated?

Once the base cabinets are installed, level and fastened. Fabricators template on the installed bases, so book them for the day after the install finishes.

05

Do I need to be home during cabinet installation?

Be there at the start, to confirm the layout, and at the end for the walkthrough. We agree on access for the days in between before the job begins.

06

Can you install cabinets in a new construction or ADU project?

Yes, once drywall and rough-ins are done. We coordinate with your builder so the cabinets go in after the messy trades.

Plumbing, electrical and after the install

01

Do you hook up the sink and appliances?

Plumbing and electrical connections are made by licensed trades. We prepare the cut-outs and openings so the plumber and electrician can connect everything without modifying the cabinets.

02

Do I need a permit to install cabinets in Austin?

Usually not for the cabinets. The City of Austin's permit-exempt list includes "cabinets, countertops, and similar finish work." Moving plumbing, gas or electrical lines isn't on that list.

03

Can you install under-cabinet lighting?

Plug-in or low-voltage LED lighting, yes. Hardwired lighting needs a licensed electrician. Either way, plan the wiring before the uppers go up, because running wire behind a cabinet that's already fastened to the wall means taking it down again.

04

Can my floor support a heavy stone countertop and island?

Most floors can. Older pier-and-beam floors may sag under a large stone island, so if your house is on piers, have the framing checked by a foundation or structural pro before you order the stone.

05

What should I check after my cabinets are installed?

Check that the gaps between doors are even, drawers slide smoothly, boxes feel solid, the bases are level and nothing is damaged. Point out anything you see at the walkthrough.

06

Will my cabinet doors need adjusting later?

Some settling and seasonal movement is normal in Austin houses. Most cabinet hinges adjust with a screwdriver in three directions: in and out, up and down, and side to side.

07

Can you add crown molding or panels after installation?

Yes. Crown, light rail and end panels can all be added later, though they're easiest to plan with the install.

Free written estimate

Call an Austin carpenter today

Store-bought, IKEA or custom, installed level, square and countertop-ready, with a free written quote.

  • Homeowners

    From a single rotted porch post in a 1920s bungalow to a custom cedar deck overlooking the Hill Country.

  • Older Austin homes

    Original trim, porches and windows repaired with lumber, fasteners and finishes chosen for Central Texas.

  • Businesses and property managers

    Tenant improvements, commercial millwork and ongoing repairs for rental homes.