Structural, repair and remodeling · Austin, TX

Commercial carpentry for offices, retail & restaurants in Austin, TX

A commercial job usually comes with a signed lease and an opening date. The space has to look the way the brand needs it to look, it has to pass inspection, and it has to hold up to daily foot traffic for the length of the lease.

Read more

Carpenter Austin Texas provides commercial carpentry in Austin for offices and retail shops, for restaurants and for managed properties. As an Austin carpenter with a commercial side, we handle tenant finish-outs from the first partition to the last piece of trim. We also build reception desks and store fixtures, install millwork and take on ongoing repairs. We work directly for owners and tenants, and as a carpentry subcontractor for general contractors. If you're looking for a commercial carpenter in Austin who keeps to a schedule and leaves a clean site, the first step is a free written bid.

Send drawings or a scope. We'll walk the space and return a clear written bid, then work to the schedule and keep the site protected and clean.

The numbers behind this work

01What we do

Commercial carpentry services in Austin

In short

Most commercial clients need a carpenter for the interior work that makes a space usable and on-brand: the walls and doors that divide it and the counters and casework people use every day. The sections below cover the six kinds of commercial work we do.

  1. Tenant improvements in Austin, also called tenant finish-outs, turn a shell space or a second-generation space into the layout the new tenant needs. A shell is an empty space with no interior build-out. A second-generation space was built out for a previous tenant and gets reworked.

    Our carpentry scope on a tenant finish-out in Austin typically includes:

    • Partition framing and blocking
    • Door frames and doors, with hardware
    • Trim and casing
    • Built-in counters
    • Reception and break-room casework
    • Wall paneling and accent walls
    • Ceiling soffits

    We work from the architect's drawings and coordinate with the general contractor and the MEP trades. Lease terms decide who pays for what. Some work falls under the landlord's work letter, and some is the tenant's scope, so we price each party's scope separately when that's how the lease splits it. The structural side of a finish-out, like new bearing walls or beams, is covered on our framing and rough carpentry page.

    A second-generation space often hides useful parts. Existing door frames, partitions and casework can sometimes be reused or adapted, which saves cost and waste. A careful walk before demolition shows what is worth keeping and what will fight the new layout.

    Ask about thisRead the rough carpentry page

  2. Office build out carpentry in Austin covers the rooms and fixtures that make an office work. We build private offices and conference rooms, and we frame and trim glass-front offices. Reception desks and phone booths are common requests, along with small focus rooms and kitchenettes. Storage walls too. We hang acoustic wall panels and change out door hardware when a new tenant moves in.

    Many office jobs happen while the office is still in use. We phase the work by zone, so one part of the floor is under construction while the rest stays open.

    If you need an office carpenter near me for door and trim details, our trim and finish carpentry page goes deeper on that work.

    Glass-front offices need framing that is straight, plumb and square, because glass and aluminum storefront frames do not forgive a wall that bows. That accuracy is set at the framing stage, long before the glazing contractor arrives.

    Ask about thisRead the finish carpentry page

  3. Retail fixtures in Austin stores take a beating. Our store carpentry covers display walls and slatwall shelving. We build cash wraps and checkout counters, and we frame fitting rooms and build window displays. It also covers merchandising updates and store refreshes, when a layout changes for a new season or a new product line.

    Some stores buy fixtures from a vendor and need them assembled and anchored. Others need custom fixtures built to fit the space. The materials question is the same either way. High-traffic edges get hit by shopping carts and shoes all day, so we look at where a fixture takes wear and pick materials for that spot. Hardwood holds up at edges and can be refinished. High-pressure laminate resists scratches and stains on large flat surfaces and costs less.

    Plan fixtures around how people move. Aisles that fit strollers and carts, a checkout placed where staff can see the door and fitting rooms near the sales floor all shape where carpentry goes. Mark them on the plan before any fixture is built.

    Ask about this

  4. Restaurant carpentry in Austin covers the front-of-house woodwork guests see and touch. That includes bar fronts and back bars and the host stand. It also includes banquettes and booth seating. Wall paneling and shelving round it out. Restaurants with patios add outdoor carpentry that has to handle summer heat and sudden storms. Repairs between services, like a loose booth back or a broken bar rail, are part of the work too.

    Surfaces near food prep have to meet health department requirements. We build those areas with the materials the designer specifies for them, and we don't substitute.

    Booths and banquettes take more abuse than most furniture. Seat frames get stood on, backs get leaned against all night and bases get kicked and mopped. Solid framing, hardware anchored into blocking and a durable kick surface at the base keep them tight through busy seasons.

    Ask about this

  5. Commercial millwork in Austin covers custom reception desks and wall paneling. Casework and built-in seating are part of it, and so are decorative ceilings and trim packages built from shop drawings. Architectural millwork in Austin is the same family of work, built to an architect's design and detailed for one space.

    Materials are chosen for wear:

    • Hardwood veneer: a wood look over a stable core
    • Solid wood: edges that need to be refinished over time
    • Laminate: hard-wearing, lower-cost flat surfaces
    • Solid surface: counters with joints that are hard to see and scratches that can be sanded out

    A millwork job starts with the designer's drawings. Shop drawings and samples come next, then fabrication, and site installation comes last. Shop drawings show every dimension and joint, and approved samples lock in the finish, so nothing gets built until you've signed off. If you were searching for commercial woodworking near Austin TX, this is that work. Cabinet boxes and storage units are covered on our custom and kitchen cabinets page.

    Approve samples under the light the space will really have. A veneer or laminate that looks right under office lighting can read very differently in warm restaurant light or in daylight through a storefront window.

    Ask about thisRead the cabinetry page

  6. Property management repairs in Austin come in a steady stream. Rental property repairs between tenants are usually make-ready carpentry. That means fixing trim and doors and repairing cabinets and closet shelving. Loose stair rails get tightened too. We also repair rot and damage, fix items from inspection reports and handle common-area repairs in multifamily and small commercial buildings.

    What property managers need from a carpenter is mostly about reliability. They want a crew that shows up on the scheduled day and a single point of contact who knows the property. They also want itemized invoices that make sense to the owner.

    A simple standard for each property speeds up turns. One trim profile, one door style and one hardware finish across the units means parts are easy to match, repairs blend in and spare stock can be kept on hand.

    Ask about this

Fitting carpentry into a commercial schedule

Carpentry sits in the middle of most commercial schedules. Framing and blocking go in before the MEP rough-in and drywall, while doors, trim, casework and millwork follow paint and flooring. Knowing where each piece falls shows why a late decision on finishes or fixtures can hold up an opening.

Long-lead items set the pace. Custom millwork, special door hardware and some veneers or solid surface colors take time to order and make, so selections need to be settled early. A finish schedule that is complete when bidding starts protects the opening date more than any rush at the end.

Blocking is the cheapest early step in a finish-out. Wall-mounted screens, shelving, grab bars, signage and display fixtures all need solid backing, and adding it after drywall means cutting and patching finished walls.

02Who it's for

Who we work with

In short

We work for business owners and tenants, as a carpentry sub for general contractors, from architects' and designers' drawings, and for property and facility managers.

  1. 01
    Business owners and tenants

    We contract directly with you, and we take jobs of every size.

  2. 02
    General contractors

    As one of the commercial carpenter contractors you can bring onto a job as a carpentry sub, we work to your schedule and alongside your other trades.

  3. 03
    Architects and designers

    We build to drawings and produce shop drawings for millwork, so your design gets built the way it was drawn.

  4. 04
    Property and facility managers

    We handle ongoing repairs and unit turns. You deal with one contact and get clear invoices.

Getting a quicker, tighter bid

Whoever you are, the same few things make a bid faster and more accurate: current drawings, a finish schedule, any millwork elevations, the lease or contract scope that applies and the dates you are working toward. Missing pieces turn into allowances and assumptions that tend to change later.

General contractors get the most from a carpentry sub when the scope split is clear. Who supplies doors and hardware, who installs blocking for other trades and who patches after the MEP work are common gaps. Settling them in writing avoids arguments at the punch list.

Designers gain from early questions. A quick review of a millwork detail before bidding can catch a joint that will not hold up or a material that is hard to source, while there is still time to adjust the design.

Wood should be cut, fitted, and finished like it’s meant to last a lifetime.

The owner, Carpenter Austin Texas

Wood should be cut, fitted, and finished like it’s meant to last a lifetime.

The owner, Carpenter Austin Texas

03How it works

How a commercial carpentry project runs

In short

Walk the space, bid in writing, approve shop drawings and samples, coordinate permits, install on schedule, clear inspections and the punch list, then close out with a clean site and documentation.

  1. Step 01

    Walk the space

    We walk the site and review the drawings or the written scope.

    The walk-through looks at the space as it is now, not only as it is drawn. Existing walls, ceiling heights, floor levels and the condition of any earlier build-out are checked against the plans. Access matters too: where materials come in, how far they travel and whether a freight elevator or loading dock has to be booked.

    In an occupied space, the walk also notes which areas must stay open and when the business is busiest. Bring the drawings, the finish schedule and your target opening date. If the drawings and the site disagree, now is the time to find out, not on install day.

    What to expect You walk the space with us, share drawings and dates, and point out areas that must stay open during the work.

  2. Step 02

    Written bid

    The bid lists what's included and what's excluded, plus a schedule.

    The written bid turns the scope into line items. It states what is included, what is excluded and what is carried as an allowance, and it sets out the schedule the price is based on. Exclusions deserve as much attention as inclusions, because they show what someone else will need to cover.

    Compare bids on the same basis. Check that each one includes the same materials, the same hardware and the same assumptions about access and phasing. A low number often hides a missing scope item or an allowance that will grow. Ask how changes will be priced before you sign.

    What to expect You review the bid line by line, compare inclusions and exclusions with other bids and decide whether to go ahead.

  3. Step 03

    Submittals

    Where millwork is involved, we provide shop drawings and samples for approval, along with finish selections.

    Shop drawings turn the designer's intent into exact dimensions, joints, materials and hardware for each piece of millwork. They show how each piece fits the room and meets walls, floors and other trades, such as a sink cut-out or a power grommet. Samples show the actual veneer, laminate, solid surface and finish.

    Review them carefully, since approval locks in what gets built. Check that outlets, data ports and plumbing on the drawings match the MEP plans, and look at samples in the space's real lighting. Changes after approval usually cost time and money, and with custom pieces they can push the opening date.

    What to expect You or your designer review the shop drawings and samples, mark any changes and sign off before anything is built.

  4. Step 04

    Permits

    We coordinate permits with the general contractor or the owner.

    Most finish-outs need a City of Austin permit before work starts, and the application rests on the architect's plan set. The carpentry in those plans covers partitions, doors, counters and anything that affects accessibility or fire safety. Review time varies with the application type and the size of the project.

    Coordination means tying the carpentry schedule to the permit's progress. Framing and blocking wait for the permit to be issued, and the inspections it lists decide when walls can be closed. Keep the approved plans handy, because inspectors check the work against them and a field change may need approval first.

    What to expect You hear where the permit stands and how the inspection dates shape the carpentry schedule.

  5. Step 05

    Scheduled install

    We install on the agreed schedule, including phased work to keep the business running.

    Installation follows the agreed sequence. Framing and blocking go in first, then doors, trim, casework and millwork once paint and flooring are ready for them. Millwork is checked against the shop drawings as it is set, then leveled, scribed to the walls and anchored into the blocking placed for it earlier.

    In an occupied space, work moves zone by zone behind dust barriers, with stock and finished surfaces protected and each area cleaned before it reopens. Let the crew know about anything changing on your side, such as a delivery, an event or a landlord visit, so the plan can adjust before it clashes.

    What to expect You see the work move zone by zone, with barriers up and each area cleaned before staff or customers use it.

  6. Step 06

    Inspections and punch list

    The work is inspected, and any punch list items are fixed.

    Inspections check the work against the approved plans at the stages the permit sets, such as framing before walls are closed and a final once the space is complete. Carpentry items that come up often involve blocking, door hardware, accessible counters and clear floor space. Any correction is made and checked again.

    The punch list is a walk of the space with everyone who cares about the result. Each item is noted with its location: a scuffed panel, a door that drifts open, a gap at a trim joint. Write the list clearly and share it once, so nothing gets lost between trades, then tick each item off as it is fixed.

    What to expect You walk the space, note punch list items with their locations and see each one fixed and checked off.

  7. Step 07

    Closeout

    The site is cleaned, we do a final walk-through with you and you get the documentation for the job.

    Closeout turns a job site back into a business. The space is cleaned of dust, offcuts and packaging, and protection comes off finished surfaces. The final walk-through confirms the punch list is complete and that doors, hardware and casework all work as they should.

    The documentation is what you keep for the life of the lease. Check that it records the materials and finishes used on millwork and casework, plus hardware details and any care guidance for surfaces such as veneer and solid surface. Those details make later repairs and matching much easier, especially when the space is reworked for a new tenant.

    What to expect You do a final walk-through with us and receive the job documentation, with the space clean and ready to open.

Good to know

You have one point of contact from bid to closeout, and you hear from us when anything changes.

04Rules & permits

Permits, plans and compliance for Austin commercial work

In short

Most commercial finish-outs need a permit from the City of Austin Development Services Department (DSD). The City publishes a Commercial Remodel and Tenant Finish-Out submittal requirements list, which calls for a complete, scaled set of construction plans covering structural, architectural, mechanical, electrical, plumbing and fire safety items.

Quick Turnaround
Projects of 5,000 square feet or less
Small Project
Interior remodels and finish-outs under 10,000 square feet
Where to apply
Austin Build + Connect (AB+C) portal

Smaller projects have faster options

The City's commercial plan review page says the Quick Turnaround application is for projects of 5,000 square feet or less, and it lists tenant finish-outs inside an existing building as allowed work. Projects using hazardous materials, or sitting in the floodplain or the Wildland Urban Interface, don't qualify. The same page lists a Small Project application for interior remodels and tenant finish-outs under 10,000 square feet. Applications go through the City's Austin Build + Connect (AB+C) portal.

Accessibility affects carpentry directly

Counter heights and door widths in Texas commercial spaces, and restroom layouts, are governed by the Texas Accessibility Standards, administered by the Texas Department of Licensing and Regulation (TDLR). We build to the architect's compliant drawings.

City requirements change

Check the current documents on austintexas.gov before you submit.

Accessibility shapes carpentry details

Counter heights, knee space under a service counter, the type of door hardware and the clear space beside a door all come from accessibility standards. Changing any of them in the field, even slightly, can fail an inspection, so those dimensions are built exactly as drawn.

Field changes need a paper trail

When the site does not match the plans, a quick decision on the spot can leave the built space out of step with the permitted set. Route the change through the architect so the drawings and the room agree at the final inspection.

Landlords often have their own rules

Many commercial buildings publish tenant construction guidelines covering work hours, noise, deliveries and protection of common areas. Read them before scheduling, because they can affect sequencing as much as the City's requirements do.

05Checklist

Working around your business

In short

Zone-by-zone phasing, dust control, daily clean-up, coordination with building management and outdoor-rated patio materials keep the business running while the work goes on.

A commercial job has to fit around a business that's still trying to make money. How we keep the disruption down

  • Phased work in occupied offices, one zone at a time
  • Dust control with plastic barriers and covered returns, and protection for stock and finished surfaces
  • Daily clean-up, so the space is usable the next morning
  • Coordination with building management in downtown and Domain-area towers, where loading docks and freight elevators have to be booked ahead and a certificate of insurance is usually required before work starts
  • Patio carpentry built with outdoor-rated materials and fasteners for Austin heat and storms

Preparing your team for the work

Tell staff and customers what to expect before work starts: which areas are closed, where an entrance or restroom has moved and when the louder work happens. A clear sign and a short note to staff head off most complaints.

Move sensitive items out of the work zone, including electronics, files, stock and anything hung on a wall that shares a partition with the work. Vibration from cutting and fastening can shake items off shelves on the other side of a wall.

Name one person on your side who can make quick decisions. Small questions come up during any phased job, and an answer the same day keeps the work moving instead of waiting.

06Pricing

Commercial carpentry costs and bids

In short

We haven't found reliable public pricing for commercial carpentry in Austin, so we won't quote a range here. What we can explain is how bids are built.

There are three common bid types. A lump sum is a fixed price to complete drawings. Time and materials suits repairs and work with unknowns. Unit prices fit repeat items, like a price per door or per fixture.

A good bid lists what's included and what isn't

It names the materials and states the schedule, along with how changes will be priced. That last part matters most once work starts.

Complete drawings bring firmer prices

When details are missing, bids carry allowances and assumptions, and each one is a likely change order later. Finishing the design, especially millwork details and the finish schedule, before bidding usually saves more than it costs.

Phasing and access add real cost

Working one zone at a time, carrying materials through a lobby or booking a freight elevator all add labor. Those costs belong in the bid, so describe access and phasing clearly when you ask for prices.

Durable materials can cost less over a lease

A cheap laminate edge or a soft finish may need repair or replacement before the lease ends. Spending more on the surfaces that take the most wear often lowers the total cost of running the space.

07Why us

Why Austin businesses choose Carpenter Austin Texas for commercial work

In short

Crews that keep to the schedule, one team from framing through millwork, materials chosen for heavy use and Texas heat, protected occupied spaces, and written bids and change orders.

  1. 01
    We show up when scheduled, which keeps every trade and your opening date on track
  2. 02
    Framing, finish carpentry, cabinetry and millwork come from one team, so the details line up
  3. 03
    We pick materials for heavy use and for Central Texas heat and humidity
  4. 04
    Occupied spaces stay protected and clean
  5. 05
    You get clear written bids, and honest change orders in writing before extra work starts

What to check on any commercial carpenter

Ask how the carpenter handles a drawing that does not match the site. A good answer involves stopping, raising the question in writing and waiting for the designer's response rather than improvising a fix.

Ask how changes are priced and approved. Written change orders that show the price and the schedule impact, approved before the work happens, protect both sides and keep the final invoice free of surprises.

Ask who your contact will be from bid to closeout. A single point of contact who knows the job cuts down on mixed messages between your team, the general contractor and the carpenters on site.

Wood should be cut, fitted, and finished like it’s meant to last a lifetime.

The owner, Carpenter Austin Texas

08Service area

Areas we serve for commercial carpentry

In short

We take commercial work across Austin: Central (including downtown), North, North Central, Northeast, Northwest, Far North, East, West, South, South Central, Southeast Central / Riverside, Southeast and Southwest Austin.

If you were searching for commercial carpenters near me from an office or a storefront in any of those areas, we cover it.

Open in Maps

Central Austin

Central Austin older bungalows and cottages, historic districts like Hyde Park, and renovations on tight lots.

older bungalows and cottages, historic districts like Hyde Park, and renovations on tight lots.

(737) 415-9388

Central Austin, TX

Open in Maps

North Austin

North Austin mid-century ranch homes in established neighborhoods.

mid-century ranch homes in established neighborhoods.

(737) 415-9388

North Austin, TX

Open in Maps

Northeast Austin

Northeast Austin newer subdivisions sitting on the clay east of I-35.

newer subdivisions sitting on the clay east of I-35.

(737) 415-9388

Northeast Austin, TX

Open in Maps

Northwest Austin

Northwest Austin Hill Country lots on sloped limestone, with decks built for the view.

Hill Country lots on sloped limestone, with decks built for the view.

(737) 415-9388

Northwest Austin, TX

Open in Maps

Far North Austin

Far North Austin newer subdivisions where builder-grade trim and fences often need upgrades.

newer subdivisions where builder-grade trim and fences often need upgrades.

(737) 415-9388

Far North Austin, TX

Open in Maps

East Austin

East Austin older homes east of I-35 on clay soil, with plenty of infill and renovation.

older homes east of I-35 on clay soil, with plenty of infill and renovation.

(737) 415-9388

East Austin, TX

Open in Maps

West Austin

West Austin hillside homes on limestone, where decks and stairs follow the slope.

hillside homes on limestone, where decks and stairs follow the slope.

(737) 415-9388

West Austin, TX

Open in Maps

South Austin

South Austin established neighborhoods with a mix of older and newer homes.

established neighborhoods with a mix of older and newer homes.

(737) 415-9388

South Austin, TX

Open in Maps

South Central Austin

South Central Austin older houses around neighborhoods like Travis Heights, many with porches and original trim.

older houses around neighborhoods like Travis Heights, many with porches and original trim.

(737) 415-9388

South Central Austin, TX

Open in Maps

Southeast Austin

Southeast Austin growing neighborhoods on clay soils, where doors and trim feel the ground move.

growing neighborhoods on clay soils, where doors and trim feel the ground move.

(737) 415-9388

Southeast Austin, TX

Open in Maps

Southwest Austin

Southwest Austin hillside lots with decks and views toward the Hill Country.

hillside lots with decks and views toward the Hill Country.

(737) 415-9388

Southwest Austin, TX

How location affects a commercial job

Downtown and high-rise jobs bring building rules: booked loading docks and freight elevators, protected corridors and set delivery windows. Those details add planning, so mention the building and its management contact when you ask for a bid.

Suburban retail centers and office parks usually offer easier access but may have landlord rules on storefronts and work in common areas. Restaurants in strip centers often share walls with neighbors, which affects noise and how fixtures are fastened.

Older buildings in central neighborhoods can hide uneven floors, out-of-plumb walls and old framing behind the finishes. Plans for those spaces should allow for scribing and shimming so new millwork sits straight.

09Questions

Commercial carpentry FAQs

Bids & pricing

01

How do you price commercial carpentry work?

It depends on how defined the scope is. Work with complete drawings is usually priced as a lump sum. Repairs and jobs with unknowns are often priced as time and materials. Repeat items can carry unit prices. Your written bid states which method applies to each part of the job, so you can see where the price is fixed and where it can move.

02

Can you bid from architectural drawings?

Yes. Send the plans along with the finish schedule and any millwork details or elevations. The more complete the set, the tighter the bid.

03

How are change orders handled?

In writing, before the work changes. Each change order shows the price and the effect on the schedule, and work on the change starts once you approve it.

04

Is there a minimum size for commercial jobs?

We take commercial jobs of every size, from a single door repair in an office to a full tenant finish-out. Send the scope and we'll tell you how we'd price it.

05

Who pays for tenant improvements, the landlord or the tenant?

It depends on the lease. Many leases include a tenant improvement allowance from the landlord, with the tenant paying anything beyond it. Some split the work between a landlord work letter and tenant scope. We can bid either party's scope. Your lease and your broker or attorney are the authority on who owes what.

Scheduling & disruption

01

How long does a tenant finish-out take?

There's no single answer. It depends on the size of the space and how long permit review takes, and custom millwork adds its own lead time. We schedule backward from your opening date so each step has room.

02

Can you work while our office stays open?

Yes. We split the work into zones, control dust with plastic barriers and covered returns, and schedule the loudest work for the hours when it bothers the fewest people.

03

How far ahead should we book commercial carpentry?

As early as you have drawings. Custom millwork needs time for shop drawings and approval ahead of fabrication, so the earlier we see the plans, the more room there is in the schedule.

04

Do you work with our general contractor's schedule?

Yes. As a carpentry sub, we follow the GC's schedule and coordinate with the other trades on site.

Permits & compliance

01

Does a commercial finish-out need a permit in Austin?

Most do. The City of Austin Development Services Department has a Commercial Remodel and Tenant Finish-Out submittal list. Small office and retail finish-outs of 5,000 square feet or less may qualify for the Quick Turnaround application. Check the current requirements with DSD.

02

Do you build ADA-compliant counters and doors?

We build to the architect's accessible drawings. In Texas, commercial accessibility follows the Texas Accessibility Standards, administered by the Texas Department of Licensing and Regulation, and the architect sets the dimensions to meet them.

Materials & durability

01

What materials hold up best in high-traffic commercial spaces?

High-pressure laminate and solid surface hold up well on counters and large flat surfaces. Hardwood edges take impact better than laminate edges and can be refinished. The finish matters as much as the material, because a cheap topcoat wears through at the edge of a counter long before the laminate or hardwood under it does. The right mix depends on how the space is used.

02

What is the difference between millwork and casework?

Millwork covers trim and paneling, along with custom wood features built for one specific space. Casework means cabinet boxes and storage units. Many commercial jobs need both.

03

Wood or steel studs for office partitions?

Steel studs are common in commercial buildings. Wood studs show up in some smaller buildings. The plans and the building code for that building decide, and we frame to what the drawings call for.

Property managers & ongoing work

01

Do you work with property management companies in Austin?

Yes. We handle make-ready work between tenants and repairs, and we fix carpentry items from inspection reports. You get an itemized invoice for each job.

02

Can you handle make-ready carpentry between tenants?

Yes. Typical make-ready work covers trim and doors and closet shelving. Cabinet repairs and small rot repairs come up often too.

03

Can you repair rental homes as well as commercial buildings?

Yes. We do that work for landlords and property managers. Homeowners repairing their own homes use our home repair service.

Free written estimate

Call an Austin carpenter today

Offices, retail and restaurants across Austin, on schedule, with clean sites and clear written bids.

  • Homeowners

    From a single rotted porch post in a 1920s bungalow to a custom cedar deck overlooking the Hill Country.

  • Older Austin homes

    Original trim, porches and windows repaired with lumber, fasteners and finishes chosen for Central Texas.

  • Businesses and property managers

    Tenant improvements, commercial millwork and ongoing repairs for rental homes.