Plumbing, electrical and HVAC work goes to licensed trade pros, who pull their own trade permits. Your estimate states who hires and schedules each trade, so nobody is guessing on day one.

Structural, repair and remodeling · Austin, TX
Home remodeling & renovation carpentry in Austin, TX
Home remodeling in Austin covers a lot of ground, and Carpenter Austin Texas does it as a carpentry company. We remodel kitchens and bathrooms, open up closed-off layouts, convert garages, build wheelchair ramps and aging-in-place upgrades, and renovate rentals for investors. When the house simply needs more room, we build room additions and backyard ADUs too.
Read more
Austin houses have a habit of surprising people. Open a wall in a 1930s bungalow and you may find old-growth studs at odd spacing, floors that have dropped an inch toward the back, or rot nobody knew about. Carpentry remodeling means the people who frame, fit and finish the work are the ones who find those problems and fix them properly. If you're looking for a carpenter in Austin to take on a remodel, you'll get a clear written estimate from us. We show up when we say we will, protect your home while we work, and clean up before we leave.
Walk us through the rooms you want to change. We'll give you an honest scope and a written estimate with a realistic timeline.
- Free written estimateYou know the scope and the price before anyone picks up a saw.
- On time, as promisedWe show up on the day and at the time we agreed.
- Your home protectedFloors, furniture and the yard are covered while the work goes on.
- Clean job siteThe work area is swept and cleared before we leave.
- Built for Texas weatherLumber, fasteners and finishes chosen to hold up to Austin heat, storms and clay.
- Jobs of every sizeOne rotted porch post gets the same care as a custom build.
The numbers behind this work
- 3 unitsnow allowed on one single-family lotAustin's HOME amendments allow up to three housing units, including tiny homes, on a single-family-zoned lot (SF-1, SF-2, SF-3).City of Austin Development Services · 2024
- 1,800 sq ftsmallest lot for a new houseHOME Phase 2 lets a single home be built on a lot as small as 1,800 square feet, down from the 5,750-square-foot standard.City of Austin Development Services · 2024
- 5,750 sq ftminimum lot for an ADUTo add an accessory dwelling unit in Austin the lot must be at least 5,750 square feet and zoned SF-1, SF-2 or SF-3.City of Austin Development Services · 2026
- 112.9%of a minor kitchen remodel recoupedA minor kitchen remodel costing $28,458 returns $32,141 at resale nationally, recouping 112.9 percent of its cost.Zonda Cost vs. Value · 2025
01Good to know
What a remodeling carpenter does in your renovation
Most of a remodel is carpentry. A remodeling carpenter handles the demolition and the framing changes: walls moved, openings cut, headers sized for the load. Subfloor and structural repair come next, then doors and windows, trim and molding, built-ins, cabinet installation, stairs and the small finish details you see every day. See our page on rough carpentry in Austin for more on the framing side.

Why does it matter that a renovation carpenter is on site?
Some remodelers sub out every task and send a project manager to check in. That works until a wall comes down and the floor under it is rotten, or the new cabinets won't sit flat on a sloping floor. A carpenter standing in the room catches that the same day and fixes it at the framing stage. It also means the trim lines up, the doors close without rubbing, and the built-ins meet the wall without a gap.
Moving a wall starts with tracing what it carries
Before a wall comes out or an opening widens, the carpenter follows the load: joists or rafters bearing on top, and a post, beam or footing below. A new header has to sit on jack studs that bear on something solid all the way down, or the opening slowly sags.
Rough openings are framed to the product, not the drawing
Doors, windows and cabinets arrive at fixed sizes, so openings are framed to the actual unit plus shim space. Straight, plumb framing at this stage is what lets the trim go on later without filler strips or wide caulk lines.
Blocking goes in while the studs are bare
Wood blocking for grab bars, wall cabinets, TV mounts and heavy light fixtures is cheap to add before drywall and awkward to add after. The same open-wall stage is when holes and notches cut by other trades get checked so no joist or plate is left weakened.
02What we do
Remodeling services we offer in Austin
Here are the remodels we take on. Each section covers the carpentry involved and what's specific to Austin homes, from slab-on-clay tract houses to pre-war bungalows. If your project mixes several, one estimate can cover the lot.
Kitchen remodeling in Austin ranges from a cabinet and countertop refresh to a full gut. In between are layout changes, such as moving the sink to an island, and opening the kitchen to the living room.
The carpentry is most of the job. Framing changes come first, then subfloor repair, which is common under old sinks and dishwashers where slow leaks have soaked the plywood. Cabinets go in next, scribed to walls that are rarely square in older Austin houses. Islands and open shelving finish the room. Plumbing, electrical and range-hood venting are coordinated with licensed trades so the rough-ins land where the cabinets need them.
On cost, two published guides give a sense of the range. Angi's Austin guide lists kitchen renovations at roughly $14,300 to $39,800. Block Renovation's Austin data puts small galley kitchens around $15,000 to $28,000 and medium kitchens (140 to 200 sq ft) around $26,000 to $50,000. These are third-party 2026 figures, not our prices. Your written estimate gives you ours.
For cabinet styles and built-to-fit boxes, see our page on custom cabinetry in Austin.
Check the floor before you settle on an island. A stone top is heavy and does not flex, so the floor under it has to be level and stiff. In older pier-and-beam kitchens the joists under a planned island sometimes need sistering or extra blocking so the top does not crack as the floor moves.
Bathroom remodeling in Austin usually means one of three jobs: a tub-to-shower conversion, a curbless shower for easier access, or a full gut down to the studs. In every case, the tile is only as good as the waterproofing behind it, so that part gets done right before any tile goes up.
The carpentry under the tile matters most. In older Austin homes, subfloor and even floor joists around toilets and tubs are often rotted from years of small leaks, and that has to be cut out and rebuilt before new tile goes down. We add solid blocking in the walls for grab bars and wall-hung fixtures, then install the trim and built-in storage.
Ventilation matters in a humid Austin summer. A fan sized for the room and ducted outside keeps moisture out of the new wood trim and the drywall.
Angi's Austin guide lists an average bathroom remodel around $13,211, with most between about $7,445 and $19,659. Measured by area, Angi gives $70 to $250 per sq ft depending on finishes. Those are Angi's figures, not ours.
Shower niches and benches are framed before the waterproofing goes on, so decide on them early. A curbless shower needs the floor recessed so water runs toward the drain, which means planning around which way the joists run and how deep the subfloor can drop.
Open concept remodeling in Austin usually joins the kitchen to the living and dining area by taking out one or two walls. The first question is whether the wall is load-bearing, and what runs through it: plumbing, wiring or ductwork.
A load-bearing wall is replaced by a beam. A flush beam hides inside the ceiling and costs more; a dropped beam hangs below it and costs less, and some owners like the look. The City of Austin's Interior Remodel permit covers changes to structural components. For the structural side of the job, see our page on load-bearing wall removal.
Once the wall is gone, there's a strip of bare subfloor where it stood. Patching wood flooring so it reads as one floor takes matched boards woven into the old ones. Our Austin wood flooring installers handle that.
Taking out a wall often exposes a ceiling height change or a duct run where the wall stood. Decide early whether you want one flat ceiling, which can mean rerouting ductwork, or whether a boxed soffit is acceptable. That choice shapes both the look and the estimate.
Garage conversions in Austin turn an attached garage into a bedroom, den, gym or studio. It's often the cheapest way to add living space, because the walls and roof already exist.
The carpentry list is long. We frame in the garage door opening and match the exterior so the house doesn't look like it still has a garage. The floor gets raised or leveled over the slab to meet the house. Then come insulation, windows sized for egress where the room will be a bedroom, drywall and trim.
Austin has its own permit for this. The City's Garage Conversion or Carport/Porch Enclosure application covers legally established garages, as long as the project keeps the existing roof and doesn't change the use of the property. If a new roof is needed, the City treats the project as an addition.
Adding a kitchen changes things. Any space with habitable rooms, a full bathroom and permanent cooking facilities counts as a dwelling unit in Austin, so the project leaves the garage conversion path. That's the ADU process; see our ADU builder in Austin page. We also confirm any parking requirement for your lot with Development Services. If you live in an HOA, check its rules on garage doors and street-facing changes as well.
Garage slabs usually sit lower than the house and slope toward the door so water drains out. A framed floor over sleepers levels the room, and it needs a vapor barrier underneath, because a concrete slab on the ground carries moisture up into any wood laid on it.
Interior remodeling in Austin often means refreshing several rooms at once. That can include new trim and doors, flooring, built-ins, updated stairs, reconfigured closets and ceiling changes such as raising a flat ceiling or adding beams.
Whole-home renovations are common in dated 1970s to 2000s houses, where builder-grade trim, hollow-core doors and a closed-off kitchen all need replacing at the same time. Doing it in one project means each trade comes through once.
Most people want to keep living at home. We plan the work in phases, closing off one zone at a time with dust walls so you always have a working bathroom and a place to sleep.
Block Renovation's Austin data puts whole-home renovations around $188 to $252 per sq ft, a published range rather than our price. If you're planning a home office, built-in desks and shelving are covered on our custom woodwork and built-ins page.
Pick one casing and baseboard profile for the whole house before doors are ordered. The casing width sets the reveal at every door and window, and choosing it first avoids jambs and trim that do not suit each other once they arrive.
Investor renovations in Austin are for landlords and small investors who need a property ready for the next tenant or buyer.
The work usually falls into two groups. Make-ready and turn renovations happen between tenants: patching, new doors and hardware, trim repair and fresh floors. Pre-sale and pre-lease updates go further, such as a kitchen refresh or a bathroom redo that lifts the asking price or rent.
Deferred maintenance gets fixed before any cosmetic work. Rot at the sill, sagging floors and failed exterior trim will show up in a buyer's inspection, and covering them with paint only moves the problem.
We pick materials that take wear: solid-core doors, hard-wearing trim and floors that survive move-outs. You get a line-item estimate you can drop into a budget, a schedule you can plan a lease date around, and work permitted properly so nothing comes back at closing.
Standardize door sizes, hardware finishes and paint colors across your units where you can. Spares then fit any unit, and repairs between tenants become simple swaps instead of special orders that hold up the next move-in.
Wheelchair ramps in Austin are often the first change a family makes when someone's mobility changes. A wood ramp needs the right slope, flat landings at the top and bottom and at any turn, handrails on both sides and edge protection so a wheel can't roll off.
For slope, the 2010 ADA Standards for Accessible Design set a maximum of 1:12, meaning 1 inch of rise per foot of ramp. Those standards apply to public buildings. A ramp at a private home follows the residential code and the needs of the person using it, though 1:12 is a sensible starting point. Ramps aren't on the City of Austin's list of work exempt from a building permit, so we check with Development Services before building one attached to the house.
Aging in place modifications in Austin let people stay in their homes longer. The usual list:
- Wider doorways (the ADA standard calls for at least 32 inches of clear opening)
- Blocking in the walls and grab bars at the toilet and shower
- Curbless showers with no step to trip on
- Stair railings on both sides
- Lever handles instead of round knobs
- Outlets raised off the floor
- A first-floor bedroom, sometimes made from a den or dining room
Where it helps, we work with the family or an occupational therapist to match each change to the person who will use it.
Think about where the ramp lands as much as how it climbs. The bottom needs a firm, level spot with a clear path to the driveway or street, and the walking surface needs a slip-resistant finish so the ramp stays usable in rain.
Where to put your remodel budget first
Spend first on what gets buried. Framing, subfloor, waterproofing and blocking disappear once a room is finished, and fixing them later means tearing out new tile or cabinets. Hardware, paint colors and light fixtures can be swapped later with little disruption, so they are the better place to save if the budget is tight.
Grouping nearby rooms saves repeat work. If a kitchen and a hall bath both need new subfloor, or a hallway sits between two rooms getting new trim, doing them together means one round of demolition and inspections and one trim profile that matches through the house.
Decide early what stays. Keeping existing cabinets, a cast iron tub or original flooring changes how the new work has to meet the old, so it belongs in the scope from the start rather than turning into a change order halfway through.

Wood should be cut, fitted, and finished like it’s meant to last a lifetime.
03What we do
Adding space: room additions and ADUs
Sometimes a remodel can't find enough room inside the current walls. Then the choices are to build out, build up, or build a separate home in the backyard.
A ground-floor room, a primary suite or a full second story adds space without a move. In Austin, height limits, lot coverage and setbacks shape how big an addition can be and where it can go. Our page on room additions in Austin explains the options and the rules.
Austin's HOME code changes, adopted in December 2023, allow up to three housing units on many lots zoned SF-1, SF-2 and SF-3. That means a backyard cottage or casita can house a parent or a renter. See our page on backyard ADUs and casitas.
Questions to settle before you add space
Start with how the new space will be used. A primary suite needs plumbing and a code-compliant egress window, an office needs light and quiet, and a family room needs an easy link to the kitchen. The use decides where the addition attaches and which existing wall gets opened.
Building out and building up ask different questions. A ground-floor addition uses yard space and needs a new foundation tied into the house. A second story keeps the yard but depends on whether the existing walls and foundation can carry another floor, which usually calls for an engineer's review.
A separate backyard unit leaves the main house untouched during construction and gives each household its own door. It also needs its own utility connections and a clear path for people and materials to reach the back of the lot.
04What we do
Remodeling Austin homes: old and new
Austin's housing stock falls into two broad groups, and each brings its own surprises to a remodel. Older central neighborhoods like Hyde Park, Travis Heights, Bouldin Creek, Clarksville and Rosedale are full of pre-war houses. The suburbs are mostly slab-on-grade homes from the 1970s on. Weather affects both.
Many pre-1950s homes in central Austin sit on pier-and-beam foundations. They were framed with old-growth lumber, finished with plaster and lath, and built with stud spacing that doesn't match modern 16-inch layouts. Rooms are often out of square.
Remodels in these houses turn things up. Rot under a bathroom, old termite damage in a sill plate, or a past repair that cut through a joist are all common once walls and floors are open. We budget a contingency for that and explain it before the job starts, so a discovery doesn't become a dispute.
Historic rules can apply too. If your house is a City landmark or sits in a local historic district (Hyde Park is one), exterior changes need a Historic Review Application and a review by the Historic Landmark Commission. For preservation-grade work, see our page on historic home restoration.
Old plaster cracks when nearby walls are cut, so demolition next to plaster that stays is done carefully, with cut lines scored first. Where plaster has to be patched, the patch is built up to the same thickness so the wall stays flat across the joint.
Many tract homes east of I-35 and in the older suburbs sit on slabs over expansive clay. The clay swells in wet months and shrinks in drought. The house moves with it, and you see it as cracked drywall, sticking doors, out-of-level floors and gaps opening at the trim.
We check for that movement before we install cabinets, flooring or trim, and plan around it with shims, scribes and flexible joints. We don't repair foundations. If the movement is active, we'll recommend a foundation specialist or a structural engineer first.
They also share the usual remodel targets, starting with hollow-core doors and a closed-off kitchen.
Your floor choice should allow for slab movement. Floating floors ride over small slab changes better than glued or mortared tile, which can crack along a hidden slab crack. Where tile goes over a slab with a known crack, an uncoupling membrane underneath helps keep the crack from showing through.
Wood moves with the weather, and Austin's humid summers and dry winters move it a lot. New wood flooring and cabinets sit in the house to acclimate before we install them, so they don't shrink and open gaps after the job is done.
In bathrooms and kitchens, moisture control comes first: exhaust fans vented outside, sealed backsplashes and waterproofing behind tile. We pick materials that tolerate both seasons, such as primed trim and moisture-resistant board in wet rooms. And when walls are open anyway, it's the cheapest time to add insulation and seal air leaks.
Keep the air conditioning running during the remodel if you can. Wood, joint compound and paint all behave better at steady indoor humidity, and a house left closed and uncooled in summer lets new trim and floors take on moisture they later give back as gaps.
Signs to look for before you remodel
Walk the house with a level before you plan. A floor that runs downhill toward an outside wall, doors that swing open on their own and diagonal cracks at the corners of door frames all point to movement. Note them now so new work is planned around them rather than blamed for them later.
Look in the crawlspace or attic if you can reach it. Under a pier-and-beam house, damp soil, soft sill wood and mud tubes running up piers are warning signs; the tubes are termite trails. In the attic, stained roof decking tells you about leaks a new ceiling should not hide.
Ask what the old house was built from. Plaster walls, plank subfloors and full-dimension lumber need different patches, fasteners and shims than drywall and sheet goods, and matching them well is most of what makes new work look original.
05Rules & permits
Remodeling permits in Austin
Most remodels need at least one City permit, and which one depends on whether walls, structure or plumbing fixtures move.
- Code used
- 2024 International Residential Code with City amendments
- Exempt drywall repair
- Up to 128 sq ft, still built to code
Austin's permit rules for remodels are spread across several City of Austin Development Services pages. Here is what they say, checked in October 2026
- Residential Plan Review covers interior remodels, additions and new construction, checked against the Land Development Code, the 2024 International Residential Code and the City's local amendments.
- Some work is exempt from a building permit, including painting, tiling, carpeting, cabinets, countertops and drywall repair up to 128 sq ft. Exempt work still has to meet code.
- An Express permit covers some kitchen and bathroom work, but only when walls aren't moved or removed and plumbing fixtures stay where they are. In a bathroom, only the drywall around the tub, shower or sink can come out.
- The Interior Remodel permit covers changes to structural components and new or relocated plumbing fixtures. For some interior remodels, the City accepts a Structural Verification Report in place of structural drawings.
- Plumbing, electrical and mechanical work can need separate trade permits.
- Garage conversions have their own application.
- Landmarks and properties in historic districts need historic review for exterior changes.
- HOA approval is separate from the City and can be stricter.
We tell you upfront which permits your project needs before work is scheduled.
Moving a sink is a different permit from replacing one
Express permits for kitchens and baths only apply when fixtures stay where they are. Sliding a vanity along the wall or moving a toilet takes the job into the Interior Remodel permit, so settle the layout before anyone files.
Exempt work still has to be done right
Cabinets, countertops, tile and carpet may not need a building permit, but they still have to meet code. A buyer's inspector will flag poor work at resale whether or not a permit was ever needed for it.
Structural drawings are not always the only route
For some interior remodels the City accepts a Structural Verification Report instead. Ask early whether your project fits, since it changes what you need from an engineer before the application goes in.
06How it works
Our remodeling process
Seven stages run in order, and most of the decisions that shape your cost and finish are made in the first three.
- Step 01
Walkthrough
we see the rooms with you and look for problems you may not know about.
The walkthrough is where the scope starts. You show the rooms and explain what is not working: a kitchen that does not fit two cooks, a bath that leaks, a layout that cuts the house in half. The carpenter looks past the finishes, checking floors with a level, looking at how cabinets sit and searching for stains around tubs and under sinks.
Where there is access, a look in the attic or crawlspace shows a lot about what will turn up when walls open. Bring photos of rooms you like, a rough budget range and any old plans or permit records. Mention a sagging floor or a sticking door even if it seems unrelated, since it often points to structure the remodel will touch.
What to expect You walk the rooms with us, say what you want changed and point out any floor, door or leak problems you have noticed.
- Step 02
Scope and written estimate, with every allowance explained so you know which numbers can move
The estimate turns the walkthrough into a written scope: which walls move, what is demolished, what is rebuilt and what each finish allowance covers. An allowance is a set amount for something you have not picked yet, such as tile or cabinet hardware. If your final choice costs more or less, the number moves, which is why each one is listed on its own line.
Read the scope for what is left out as well as what is in. Painting, appliance hookup, trade work and hauling can sit with different people. When you compare quotes, go line by line: a lower total often skips subfloor repair or trim that another quote includes. Ask your questions now, because this document is what later change orders are measured against.
What to expect You receive a written scope and estimate, read the allowances and exclusions, and ask about anything unclear before you agree to it.
- Step 03
Design and selections
layout, cabinets, tile, fixtures and trim, settled before demolition.
Selections are where most remodel delays and change orders start, so they are settled before demolition. Cabinets set where plumbing and wiring come out of the wall, tile sets the shower framing and floor build-up, and door styles set the jamb and casing details. Picking late means rough-ins end up in the wrong place.
Bring each choice with its spec sheet or model number. A range needs a hood size and a venting route, a freestanding tub needs floor support and a fixed drain spot, and a wall-hung vanity needs solid blocking at a set height. The carpenter checks that each item fits the room and the framing before it is ordered.
What to expect You choose layout, cabinets, tile, fixtures and trim, and sign off on the final list before demolition starts.
- Step 04
Permits and scheduling
With scope and selections fixed, the permit application can describe the work accurately. The permit type follows what changes: cosmetic work may be exempt, kitchens and baths with a fixed layout may fit the Express path, and moved walls or relocated fixtures go through Interior Remodel review.
Scheduling is mostly about order and lead times. Cabinets, windows and special-order doors often take longer to arrive than the demolition and framing before them, so ordering early keeps the job from stalling half-finished. Inspections set checkpoints too: framing and rough-ins have to pass before insulation and drywall cover them. Tell us about dates that matter to you, such as a family event or a lease start.
What to expect You review which permits apply and the planned start, and tell us about any dates the work needs to fit around.
- Step 05
Protecting the home
floor protection, dust walls around the work area and clean-up at the end of every work day.
Before demolition, the floors on the route from the door to the work area are covered with protection that will not slide, and the work zone is closed off with dust walls and zippered doors. Return-air vents near the work are covered, because a running heating and cooling system pulls fine dust through the whole house.
You decide what stays in the room and what moves out. Take down shelves and pictures on nearby walls, since demolition shakes them. In older houses, painted trim and walls may contain lead, and disturbing them calls for lead-safe work practices, so mention your home's age if it has not come up. Plan where pets and children will stay clear of the work.
What to expect You clear the work area and nearby walls, and we lay floor protection and put up dust walls before demolition begins.
- Step 06
The build
demolition, framing, rough-ins by licensed trades, inspections, then finishes.
Demolition comes first, and it is where hidden conditions show up: rot, old termite damage, undersized headers or wiring that needs updating. Each finding is shown to you with its options, and the fix goes in a written change order before it is built. Framing follows, then plumbing, electrical and HVAC rough-ins by the trades.
The rough inspection stage is your last look inside the walls. Walk the room then and check outlet heights, switch locations and blocking for anything you plan to hang. Once inspections pass, insulation and drywall close the walls, and the finish carpentry goes in: cabinets, doors, trim, built-ins and flooring.
What to expect You see hidden problems as they are found, approve any change in writing, and walk the open walls before drywall goes up.
- Step 07
Punch list and a final walk-through together
The punch list is a written list of everything left to finish or correct, made by walking each room together. Typical items are a door that rubs, a caulk line to redo, a scratch in new flooring or a cabinet door out of line. Writing them down means nothing depends on anyone's memory.
Test as you walk: open and close every door and drawer, run water at each fixture, and look at trim joints in low light from a window, where gaps and dents show best. Ask for paint and stain color names and care notes for new finishes. Final inspections close out the permits, so keep that paperwork with your house records.
What to expect You walk every room with us, test doors, drawers and fixtures, and agree a written punch list of anything left to finish.
Any change to the scope goes in a written change order with its price before the work is done. You'll hear from us regularly about what's done and what's next.
07Pricing
Home remodeling cost in Austin
Several cost guides publish Austin numbers for remodels. They're useful for judging whether a quote you've received is in the normal range for the size and finish level you want, even though they can't price your house. They are third-party 2026 figures, not our quote.
| Project | Published Austin range | Source |
|---|---|---|
| Bathroom remodel | Average about $13,211; most $7,445 to $19,659 | Angi Austin guide |
| Kitchen remodel | About $14,300 to $39,800 | Angi Austin guide |
| Medium kitchen (140 to 200 sq ft) | About $26,000 to $50,000 | Block Renovation Austin data |
| Whole-home renovation | About $188 to $252 per sq ft | Block Renovation Austin data |
Your own number depends on the house and the scope
A walkthrough and a written estimate give you a real figure instead of a range.
Set aside a contingency for what turns up once the walls are open
Older homes need a bigger one. We'll suggest an amount for your house when we write the estimate.
Published ranges price finishes, not surprises
Cost guides average many projects and rarely include rotten subfloor, a relocated drain or a new beam. Use them to judge a quote's finish level, then read what each quote says about hidden conditions.
Moving plumbing costs more than moving cabinets
A sink or toilet that stays put reuses its drain and vent. Moving one can mean new drain runs laid at the right slope, cutting into a slab or rerouting under a pier-and-beam floor, plus the inspections that go with it.
Allowances are where totals drift
Keep a running list of each pick against its allowance as you choose. Small upgrades in tile, hardware and lighting add up across a room, and tracking them as you go avoids a surprise at the final invoice.
08Why us
Why Austin homeowners choose Carpenter Austin Texas for remodeling
Carpenter Austin Texas puts carpenters on site who frame, fit and finish the work themselves. The person who sets a door jamb is the same person who cases it, so the reveals line up and the door closes clean.
- We plan for what's usually behind the walls in Austin houses, from old framing in pier-and-beam bungalows to cracked drywall in slab homes on shifting clay, and we explain it before it costs you
- We protect your home with floor coverings and dust control, show up on time, and clean up before we leave. You get a clear written estimate, and every change is written down before it's built
- You'll also get honest advice, including when a smaller project would solve the problem
Our rule for every room: wood should be cut, fitted and finished like it's meant to last a lifetime.
How to compare remodeling carpenters
Ask who will be in your house each day. When the carpenters who frame are the same people who finish, the problems behind the walls and the details at the end are seen by the same eyes. Ask how surprises are handled and what a written change order looks like.
Look closely at finished work if you can. Tight miters at casing corners, even reveals around doors, cabinets that meet the wall without thick caulk and floors that sit flat at every doorway are the details that separate careful work from fast work.
A good estimate is specific. Line items, named allowances and stated exclusions show the contractor has thought through your house rather than pricing it by the square foot, and they give you something solid to compare.
Wood should be cut, fitted, and finished like it’s meant to last a lifetime.
09Service area
Areas we serve for home remodeling
We remodel across Austin, and the type of house shapes the plan more than the part of town.
Central, North and North Central Austin
Central Austin
Central Austin older bungalows and cottages, historic districts like Hyde Park, and renovations on tight lots.older bungalows and cottages, historic districts like Hyde Park, and renovations on tight lots.
(737) 415-9388Central Austin, TX
North Austin
North Austin mid-century ranch homes in established neighborhoods.mid-century ranch homes in established neighborhoods.
(737) 415-9388North Austin, TX
North Central Austin
North Central Austin mid-century houses, many due for new trim or decks.mid-century houses, many due for new trim or decks.
(737) 415-9388North Central Austin, TX
Northeast, Northwest and Far North Austin
Northeast Austin
Northeast Austin newer subdivisions sitting on the clay east of I-35.newer subdivisions sitting on the clay east of I-35.
(737) 415-9388Northeast Austin, TX
Northwest Austin
Northwest Austin Hill Country lots on sloped limestone, with decks built for the view.Hill Country lots on sloped limestone, with decks built for the view.
(737) 415-9388Northwest Austin, TX
Far North Austin
Far North Austin newer subdivisions where builder-grade trim and fences often need upgrades.newer subdivisions where builder-grade trim and fences often need upgrades.
(737) 415-9388Far North Austin, TX
East and West Austin
East Austin
East Austin older homes east of I-35 on clay soil, with plenty of infill and renovation.older homes east of I-35 on clay soil, with plenty of infill and renovation.
(737) 415-9388East Austin, TX
West Austin
West Austin hillside homes on limestone, where decks and stairs follow the slope.hillside homes on limestone, where decks and stairs follow the slope.
(737) 415-9388West Austin, TX
South and South Central Austin
South Austin
South Austin established neighborhoods with a mix of older and newer homes.established neighborhoods with a mix of older and newer homes.
(737) 415-9388South Austin, TX
South Central Austin
South Central Austin older houses around neighborhoods like Travis Heights, many with porches and original trim.older houses around neighborhoods like Travis Heights, many with porches and original trim.
(737) 415-9388South Central Austin, TX
Southeast Central / Riverside, Southeast and Southwest Austin
Southeast Central Austin / Riverside
Riverside older homes, rentals and newer infill south of Lady Bird Lake.older homes, rentals and newer infill south of Lady Bird Lake.
(737) 415-9388Riverside, Austin, TX
Southeast Austin
Southeast Austin growing neighborhoods on clay soils, where doors and trim feel the ground move.growing neighborhoods on clay soils, where doors and trim feel the ground move.
(737) 415-9388Southeast Austin, TX
Southwest Austin
Southwest Austin hillside lots with decks and views toward the Hill Country.hillside lots with decks and views toward the Hill Country.
(737) 415-9388Southwest Austin, TX
What your part of town tells us
Central neighborhoods hold many older pier-and-beam homes with crawlspaces, where floor repairs and plumbing changes are reached from below. East of I-35 and in the older suburbs, slab homes on clay are common, so plumbing moves can mean cutting concrete and floors need checking for slab movement.
West Austin sits closer to limestone, where soil movement is less of a worry but sloped lots make access, deliveries and additions harder to plan.
Wherever you live, mention any HOA rules or historic district status on the first call, since either can add an approval step before exterior work starts.
The work runs from pier-and-beam bungalows in central Austin to slab homes in the suburbs, and each type gets planned for what's under it.
10Questions
Home remodeling FAQs
Cost & budget
01How much should I budget for a home remodel in Austin?
It depends on the scope. Published Austin guides put a bathroom remodel around $7,445 to $19,659 and a kitchen around $14,300 to $39,800, with whole-home work priced per square foot. A walkthrough gives you a real number for your house.
02What is a contingency and how much should I set aside?
A contingency is money held back for hidden conditions found once walls and floors are open, such as rot or old termite damage. Older homes need a larger one. We'll suggest an amount for your house in the estimate.
03What are allowances in a remodeling estimate?
An allowance is a placeholder budget for an item you haven't picked yet, such as tile, fixtures or cabinets. If you choose something that costs more or less, the final price moves with your choice.
04Which remodels add the most value to an Austin home?
Kitchens and bathrooms are the remodels most often cited for resale appeal. Real value depends on your house and street. A local real estate agent can tell you what buyers on your street pay more for.
05Can I remodel in phases to spread out the cost?
Yes. The trick is sequencing so early work isn't torn out later. Structural work and rough-ins for plumbing and wiring should come before finishes, even if the finishes wait a year.
Planning, permits & timeline
01How long does a home remodel take in Austin?
It depends on scope and permits. A bathroom is usually shorter than a kitchen, and a whole-home renovation takes longest. Permit review, material lead times and what's found behind the walls all change the schedule, so your estimate gives a time frame for your project.
02Can I live in my home during a remodel?
Often, yes. Phasing and dust walls make it workable, along with a temporary kitchen. A whole-home renovation or a remodel that takes out every bathroom at once may mean moving out for part of the job.
03Who pulls the permits for my remodel?
Trade permits for plumbing, electrical and mechanical work are pulled by the licensed trade doing the work. For the building permit, your estimate states who applies and what the City requires for your scope.
04Do I need an architect or designer for a remodel?
Not always. Like-for-like updates, such as new cabinets in the same layout, often don't need one. Layout changes, structural work and additions usually benefit from drawings by an architect or designer, and some need an engineer's input.
05What happens if you find rot or damage behind the walls?
We stop and show you what we found. Then we price the fix in writing and only go ahead with your approval.
06Is there a good time of year to remodel in Austin?
Interior work runs year-round in Austin. Plan around material lead times and permit review instead of the season.
Kitchens & bathrooms
01Can you keep my kitchen layout and just replace cabinets and counters?
Yes. Keeping the sink and range where they are avoids moving plumbing and gas lines, which usually makes it the lowest-cost kitchen update. In the City of Austin, cabinets and countertops alone are exempt from a building permit.
02How long will I be without a kitchen?
It depends on the scope and on cabinet and countertop lead times. Plan a temporary kitchen in another room with the fridge and a microwave.
03Is a tub-to-shower conversion a good idea?
For accessibility and space, often yes. A walk-in shower is easier to step into and can make a small bathroom feel larger. If it's your home's only tub, think about families with young kids who may buy it later.
04Why is my bathroom floor soft near the toilet?
Usually a slow leak at the wax ring has rotted the subfloor. It needs to be cut out and replaced before new tile or flooring goes down, or the new floor will crack.
05Can you remove a wall between my kitchen and living room?
Usually, yes. If the wall is load-bearing, it needs a properly sized beam and engineering, as the open concept section above explains.
06Do you install cabinets as part of a kitchen remodel?
Yes. We level cabinets on out-of-level floors and scribe them to uneven walls, so the gaps disappear and the countertop sits flat.
Garage conversions & accessibility
01Does a garage conversion need a permit in Austin?
Yes. Converting a garage to living space goes through the City's Garage Conversion or Carport/Porch Enclosure application, which covers legally established garages that keep their existing roof and don't change the property's use. We confirm the parking rule for your lot.
02Can a converted garage have a kitchen?
Adding a kitchen to a space that has a full bathroom makes it a dwelling unit under Austin's rules. Then it follows the ADU or new-unit path, not the garage conversion permit.
03Will a garage conversion hurt my resale value?
It depends on your neighborhood and what buyers there expect for covered parking. A conversion that matches the house inside and out, and was permitted, is easier to explain to a buyer than one that still looks like a garage.
04How wide should doorways be for a wheelchair?
The 2010 ADA Standards for Accessible Design call for at least 32 inches of clear opening, measured with the door open 90 degrees. Many families go wider at home. The right width depends on the chair and the person using it.
05Do I need a permit for a wheelchair ramp in Austin?
Ramps aren't on the City of Austin's list of work exempt from a building permit. The answer for your house depends on the ramp's height and how it attaches, so we check with Development Services before building.
06What are the most useful aging-in-place upgrades?
Five common ones: grab bars with solid blocking behind them, a curbless shower, stair rails on both sides, wider doors and brighter lighting in halls and on stairs.
Working with a remodeling carpenter
01What is the difference between a remodeling carpenter and a general contractor?
A remodeling carpenter does the hands-on framing and finish work. A general contractor manages the whole job, including hiring and scheduling every trade that sets foot in the house, from the plumber to the drywall crew. Your estimate spells out who does what on your project.
02What questions should I ask a remodeling contractor?
Ask who is on site each day, and who pulls the permits. Ask how change orders are priced and approved, and which items in the estimate are allowances. Get the warranty in writing.
03How do you protect my home during a remodel?
We lay floor protection along the work path and seal the work area with dust barriers. Furniture near the work gets covered, and we clean up at the end of each day.
04Can you handle remodels on rental properties?
Yes. The investor renovations section above covers make-ready work and pre-sale updates. When tenants are living there, we schedule around them and keep the work area closed off.
Free written estimate
Call an Austin carpenter today
Ready to change how your home works? We show up on time, keep a clean site and give honest answers.
- Homeowners
From a single rotted porch post in a 1920s bungalow to a custom cedar deck overlooking the Hill Country.
- Older Austin homes
Original trim, porches and windows repaired with lumber, fasteners and finishes chosen for Central Texas.
- Businesses and property managers
Tenant improvements, commercial millwork and ongoing repairs for rental homes.